Lighting Audit Handoff Checklist for ESCOs and Distributors

Writer: LumaQuote
LumaQuote
Nov 1
6 min read

A lighting audit is ready for estimating when another person can trace the fixture counts, understand the scope and identify every unresolved assumption without reconstructing the site visit. A synced file is the starting point. The handoff also needs a review decision, a named owner for open items and a clear revision.


For an ESCO, those checks protect the baseline and proposed scope. For a distributor, they help separate a product quotation from installation work that still needs a contractor's assessment. Use this checklist between the field survey and the lighting retrofit proposal, rather than waiting until the customer reviews the price.


Lighting audit handoff review graphic with Ready, Review and Hold labels for evidence, assumptions and unresolved scope.
Use review labels to decide which parts of an audit are ready for estimating.

Agree on what “ready” means


Use three simple review labels in your team's notes or handoff register. These are suggested process labels, not LumaQuote app statuses.


Review label

Meaning

Next action

Ready

The record supports the intended estimating task.

Release that portion of the scope for pricing.

Review

A documented assumption can support a preliminary estimate.

Name the assumption, reviewer and required confirmation.

Hold

Missing information could change product compatibility, quantity or installation scope.

Resolve the affected item before issuing a firm quotation.


A missing ceiling photo might be a review item when access is already documented. Unknown supply voltage can hold product selection. Neither should disappear into a general “audit complete” note.


The distinction also matters commercially: a budget estimate can carry explicit allowances, while a purchase-ready product schedule needs the exact configurations agreed for release.


1. Reconcile the building, area and fixture totals


Start with the site address, audit date, auditor and areas actually visited. List locked rooms, tenant spaces, exterior zones or other locations outside the survey. An unaudited room is not a room with zero fixtures.


Then reconcile the fixture quantities at three levels: fixture group, space and project. Count physical fixtures separately from lamps, sensors and replacement components. A four-lamp troffer is one fixture, and its eventual bill of materials may include several components.


Consider this illustrative audit, unrelated to the demo screenshot below:


Area or group

Surveyed fixtures

Proposed treatment

Open offices

48

Evaluate an LED upgrade.

Warehouse

20

Evaluate replacement, with access reviewed separately.

Exit signs

4

Retain pending a separate emergency-lighting review.

Total

72

68 evaluated for upgrade; 4 retained for review.


The arithmetic is 48 + 20 + 4 = 72 surveyed fixtures. The upgrade quantity is 68, not 72. Keep the four retained units visible so the estimator can explain the difference instead of assuming they were missed.


If one space contains different operating schedules or access conditions, split its fixture groups before handing it over. Our warehouse audit checklist covers the site details that can affect those groupings.


2. Make every important input traceable


For each group, identify the source behind the fixture type, complete system input watts and operating hours. Useful sources include readable equipment labels, manufacturer documentation, a verified schedule or recorded observations. Distinguish those from a default value or a facility manager's estimate.


Use a short note such as “Hours reported by facilities manager, October 29; weekend cleaning not yet confirmed.” That tells the estimator what the number represents and what could change it.


Do not infer complete fluorescent system power from lamp markings alone. Keep the lamp and ballast combination identifiable, and flag uncertain input watts for verification. For proposed LED equipment, record the selected wattage setting and configuration, rather than only the family's maximum rating.


For ESCO projects with performance commitments, establish the baseline and verification requirements before equipment removal. The PNNL lighting measurement and verification framework provides a reference for planning that work. A preliminary survey should not be presented as a completed investment-grade audit.


3. Check that the photos answer estimating questions


Open the photos during the review. Confirm that the relevant label is legible and that each image belongs to the correct space or fixture group. A large photo count does not establish usable evidence.


Three views often answer different questions:


  • An overview identifies the room, mounting arrangement and obstructions.

  • A fixture or nameplate image supports equipment identification.

  • An exception image explains damage, unusual mounting or restricted access.


Add a plain caption where the decision is not visible: “North aisle blocked by fixed conveyor; confirm lift position with installer.” Keep the same location name in the audit, photo reference and estimating notes.


Energy Trust of Oregon's on-site audit guidance includes collecting pre-installation photos and asking about storage, staging and installation timing. Those practical details help define a handoff. Its program context should not be treated as nationwide incentive rules.


4. Separate product questions from installation questions


A distributor can have enough information to propose a product while still lacking a dependable installed price. Mark those two decisions separately.


For the product review, check the exact model or proposed configuration, voltage, mounting, output or optic, selected power, dimming interface and required accessories. Record any unresolved emergency provision. DOE's commercial LED purchasing guidance explains why application, distribution and lighting quality matter alongside efficiency.


For installation, give the estimator the mounting height, ceiling type, access restrictions, permitted working hours and shutdown constraints. Assign electrical verification and concealed-condition questions to the qualified contractor. A site photo alone does not confirm compatibility.


Controls need their own scope notes: existing devices, affected fixture groups, intended operation, proposed hardware and responsibility for setup or commissioning. “Add sensors” is not a complete installation instruction.


5. Give each open item an owner and a consequence


Turn uncertain notes into a short action list. The useful question is what decision each item prevents.


Open item

Owner

Decision affected

Verify the loading-dock supply voltage.

Qualified contractor

Final driver and fixture selection.

Confirm weekend lighting hours.

Auditor, with facilities manager

Annual energy baseline and savings forecast.

Identify a compatible emergency arrangement.

Estimator and qualified contractor

Replacement method and complete scope.

Confirm the exact proposed product and program requirements.

Rebate coordinator or assigned estimator

Whether an incentive can be included in the estimate.


Add the due date and evidence required to close each item. If the schedule forces a budget estimate, state the affected allowance explicitly. An estimated rebate or assumed access method should remain visible as an assumption.


For incentives, identify the actual utility and program. Verify its current eligibility, documentation and approval sequence before relying on the amount. Product qualification and project approval are separate checks.


6. Freeze a revision before pricing


Label the accepted record with a date, revision and reviewer. “Audit R02, accepted for budget estimating by Alex, November 2” is more useful than “final.” Keep that reference with the estimate.


When a quantity, schedule or replacement changes, identify the affected group and the reason. Recheck its materials, labor, energy assumptions and incentive documentation. Preserve the earlier issued estimate so the team can explain the change.


A useful change note is specific: “Warehouse W-03 increased from 20 to 24 fixtures after mezzanine access; revise the product quote and lift allowance.” Avoid quietly replacing the old number while other people continue quoting from it.


Apply the review in LumaQuote


LumaQuote Field supports offline fixture, quantity, photo and note capture on iPhone, iPad and Android. Confirm the audit has synced, then open the desktop project and check that the intended areas and records arrived. Use the current field-app workflow for device and sync guidance.


LumaQuote desktop Audit tab showing demo areas, fixture quantities, watts, operating hours and an excluded exit-sign row.
LumaQuote desktop Audit tab, demo project. Review fixture groups and exclusions; verify the voltage and schedule for each actual site.

The desktop Audit tab gives the reviewer an organized place to inspect fixture lines and assumptions before choosing replacements and pricing the work. The review labels and responsibility matrix above remain your team's process; they are not automatic approval checks performed by the software.


On the Team plan, LumaQuote provides project assignment, Owner, Estimator and Auditor roles, and comments on projects and spaces. Follow the assigned editing and handoff workflow instead of assuming everyone can edit the same project simultaneously. Check current plans for included access and limits.


Start with one familiar area on the free plan, which currently allows up to three complete retrofit proposals without a credit card. Capture its evidence, confirm sync and ask another estimator to review it using these checks. The test is whether that person can explain the scope and open items from the record you handed over.